Road: 2010 Year End Report |
 |
During 2010, the Road crew completed 3,449 work order requests for services such as patching, street sweeping, catch basin repairs, curb repairs, drainage, vactoring, roadside mowing, snowplowing, and deicing of township roads.
The Road Department also completed the following work:
|
 |
|
2010 Road Paving
|
|
Paved 11.84 miles of road
|
|
Paved and power boxed township roads using 198 tons of asphalt (In-House Paving)
|
 |
|
2010 Curb & Gutter Replacement
|
|
Replaced/repaired a total of 1,236 feet of concrete curb and gutter
|
|
Installed or repaired a total of 906 feet of asphalt curb
|
 |
|
2010 Culvert Replacement
|
|
Installed, replaced, or repaired 5,108 feet of culvert pipe
|
|
Reconstructed 550 feet of roadside ditches
|
 |
|
2010 Pavement Marking
|
|
Striped 23.13 miles of center line
|
|
Striped 39.75 miles of edge line
|
 |
|
2010 Crack Sealing
|
|
Crack sealed a total of 4.7 miles of roadway
|
 |
|
2010 Vactor & Street Sweeping
|
|
Vactored 79,271 ft. ditch line
|
|
Flushed/cleaned 2,901 ft. pipe
|
|
Cleaned 185 catch basins
|
|
Swept 505 curb miles of road
|
 |